Independent IT project assurance IT Project Assurance and Expertise

On the customer’s side: specifications, contractor supervision, acceptance and audit.

We work on the customer’s side. We write and review technical specifications, supervise the contractor, accept systems on verifiable facts, and run IT and information-security audits. You pay the contractor for confirmed results. Our job is to get the project through state expertise the first time.

Monolith. Black glass, light

Who it is for

State bodies and state-owned companies

Specifications to GOST 34.602-2020, preparation for specification expertise and for the Cybersecurity Center opinion, contractor supervision through to commissioning.

Banks

Independent IT and information-security audits, specification review, system acceptance. We work under NDA, within the limits of Central Bank Regulation No. 3669.

Large business

Oversight of ERP, CRM and industry-specific system rollouts. The contractor reports in facts, not slide decks.

Project already under way

A health check in 2–4 weeks: a traffic-light rating of schedule, budget and quality, the top ten risks and a recovery plan.

Services

Each can be ordered on its own. Most clients start with a specification pre-review or a project health check.

Also in this line

Cyber expertise readiness

Gap analysis against information-security requirements and a remediation plan before submission to the Cybersecurity Center.

from UZS 80M

AI code audit and AI feature acceptance

Code and dependency security, AI quality metrics — precision and recall — against the criteria in the specification.

from UZS 50M

Procurement commission expert

An opinion on the technical parts of bidders’ submissions (Article 22 of the Law on Public Procurement).

By agreement

Prices in Uzbek sum (UZS), VAT included. The exact price and scope of work are fixed in the contract once we have reviewed the project.

Where we fit on the project map

The stages of a state IT project under Presidential Resolution PP-4328 and the GOST 34 stages. Each stage has a checkpoint with a pass condition. For banks and business, the same map without state expertise.

  1. 01

    Passport and concept

    Turnkey specification: discovery survey

    Goals are measurable, the cost ceiling is justified

  2. 02

    Specification and tender documents

    Specification pre-review or turnkey specification

    Specification ready for state expertise

  3. 03

    Specification expertise

    Responses to the state expert body’s comments

    Positive opinion received

  4. 04

    Design

    Technical supervision

    Every specification requirement is covered by a design decision

  5. 05

    Development

    Technical supervision, review of contractor documents

    Test programme and methodology (PMI) approved, requirement-to-test matrix complete

  6. 06

    Commissioning

    Independent acceptance, cyber expertise readiness

    Test reports signed

  7. 07

    Acceptance

    Independent acceptance

    Recommendation: “accept”, “with conditions” or “do not accept”

  8. 08

    Post-implementation monitoring

    Project health check

    Project goals measured and compared with the plan

Independence is what you pay for

A report from an interested party can be challenged. A report from an independent one cannot. That is why our independence rules are set out in writing and attached to every proposal.

Technical

Our experts examine the contractor’s products and processes themselves. We do not take the contractor’s conclusions on trust.

Managerial

We decide what to check, how and when. Neither the contractor nor the project office edits our findings.

Financial

Only the customer pays us. No money from contractors, vendors or their affiliates.

What we commit to

  • 01We never review our own developments or systems we maintain.
  • 02We do not bid as a contractor on lots where we wrote the specification or provided supervision.
  • 03We accept no commissions or gifts from vendors and contractors.
  • 04We describe requirements functionally, without reference to brand names.
  • 05We do not sell fixes for our own findings: the customer’s contractor makes the corrections.
  • 06We sign a declaration of independence before work begins.

How our review works

An assurance report is read by management and challenged by the contractor. So every word in it rests on evidence.

No evidence, no finding

Every finding states what was observed, where, which clause of the specification, contract or standard it was compared against, and its risk class.

Early warning

The customer learns of a critical problem in writing within one business day, without waiting for the monthly report.

Conclusion first

The report opens with a traffic light and a conclusion for management. Evidence and detail for engineers follow.

Expert signature

The conclusion is signed by the expert accountable for it. Tools speed up the review; a person makes the decision.

Standards

GOST 34.602-2020 for specifications, ISO/IEC/IEEE 29148 for requirements, ISO/IEC 25010 for quality, IEEE 1012 for verification, ISO/IEC 27001:2022 for information security.

Confidentiality

Customer materials are seen only by the project team. They are not passed to external services without written consent.

Payment works like construction supervision

Banks and state companies have long bought technical supervision for construction. An IT project is paid for the same way — there is no need to invent a new type of procurement.

Specification pre-review50% upfront, 50% on delivery of the report.
Turnkey technical specificationIn stages: survey, draft, positive opinion.
Project health check100% on delivery of the report, or 50/50.
Whole-project supervisionMonthly. 5% of each payment is retained until final acceptance of the system.
Independent acceptanceFixed price per stage or release.
IT and information-security auditFixed price per stage, estimate in person-hours.

Contract, completion certificates and invoices are electronic, via Didox or Faktura.uz. For a state customer, the contract is generated on the procurement platform using its template.

Who is accountable

Services are provided by THE BOTIROFF LLC, trading as dbit.one, an IT Park resident, with more than 10 staff. We build complex systems ourselves and see a project through an engineer’s eyes: we know where contractors lose time and quality.

Company details

Frequently asked questions

Does your opinion replace state expertise?

No. Mandatory opinions — specification expertise, procurement expertise and information-security expertise — are issued by state expert bodies. We work on the customer’s side and prepare the project to pass them the first time. Resubmitting a specification costs another 30 calendar days.

You build systems yourselves. Isn’t that a conflict of interest?

We never review our own developments or systems we maintain. If we wrote the specification or provide supervision, we do not take part as a contractor in that lot or in any lots that follow from it. We sign a declaration of independence before work begins.

Do you work with banks?

Yes. For banks we carry out IT and information-security audits, specification reviews and system acceptance, under NDA. Ongoing management of IT and information security under Central Bank Regulation No. 3669 stays with the bank; we do not take on that function.

How much does project supervision cost?

3–5% of the project budget, from UZS 25M a month. Paid monthly, with 5% of each payment retained until final acceptance. Large IT projects run on average 45% over budget (McKinsey and the University of Oxford, 5,400 projects). Supervision pays for itself if it prevents a tenth of a typical overrun.

Where do we start if the project is already under way?

With a health check. In 2–4 weeks we assess schedule, budget, product quality, requirements and management. You get the top ten risks and a 30-, 60- and 90-day plan. Then the customer decides whether supervision is needed through to the end of the project.

How do you work with the contractor?

By rules both sides know from day one. The contractor receives the factual part of our findings before the final report and can correct factual errors. The expert’s conclusions do not change at the contractor’s request.

Let’s discuss your project

Describe the project and the stage it is at. We reply within 24 hours and propose a way of working.

Discuss your project

Need an IT department, not a review?

For private business — an IT department by subscription: staff support, servers, network, backups and security under a contract with an SLA.

IT by subscription →