Technical specification review Specification pre-review
We review the technical specification before it is submitted for state expertise: its structure, every requirement, information-security requirements and the cost ceiling calculation. You get a findings report and a corrected version. Resubmission costs another 30 calendar days; the pre-review is there so you do not lose them.
- Price
- from UZS 30M
- Fixed price
- Timeline
- 10–15 business days
- Payment
- 50% upfront, 50% on delivery of the report.

What you get
- 01
Specification review report
Every finding with its location in the document, criterion and risk class. Conclusion first, detail after.
- 02
Corrected version
A finished specification text or a table of changes — the customer chooses.
- 03
Security and “digital supervision” check
Information-security requirements, the “digital supervision” function, signs of foreign software.
- 04
Cost check
The cost ceiling calculation, checked for completeness and justification.
When you need it
- The specification is ready and submission is a few weeks away.
- The contractor wrote the specification and you need a view from the customer’s side.
- A previous submission came back with comments.
- The customer is a state body or a joint-stock company with a state share of 50% or more, and the specification must be checked for the “digital supervision” function.
What we need from you
- Draft technical specification
- Project passport and concept
- Cost ceiling calculation
- List of integrations
- The customer’s current information-security requirements
How we work
- 01
Kick-off meeting
Project goals, submission deadline, who prepared the specification.
ResultReview plan and report date
- 02
Structure
We check it against GOST 34.602-2020 or the template the expertise operator requires.
ResultMissing and incomplete sections
- 03
Every requirement
We check each one against ISO/IEC/IEEE 29148: necessary, unambiguous, complete, feasible, verifiable.
ResultRegister of findings on requirements
- 04
Contradictions and brand names
We look for contradictions, gaps and references to trademarks: procurement law requires a functional description.
ResultFindings with risk class
- 05
Security, supervision, cost
Information-security requirements, the “digital supervision” function, signs of foreign software, the cost ceiling calculation.
ResultSecurity and cost section of the report
- 06
Walk-through with the author
We go through the findings with the specification’s author and prepare a corrected version.
ResultSpecification ready to submit
Prices in Uzbek sum (UZS), VAT included. The exact price and scope of work are fixed in the contract once we have reviewed the project.
Frequently asked questions
How does a pre-review differ from state expertise?
State expertise issues a mandatory opinion and is carried out by a state expert body. A pre-review is work on the customer’s side before submission: we find what could get the specification returned and fix it in advance.
The contractor wrote the specification. Is a review worth it?
That is the main reason for a review: a future contractor, without meaning to, writes the specification around its own solution. We check that requirements are described functionally, are verifiable and protect the customer’s interests.
Can you review a specification for a commercial project?
Yes. For banks and business we review specifications for developing, implementing or procuring a system against the same criteria, without the state expertise requirements.
What does the price include?
The report, a corrected version or table of changes, and a walk-through of the findings with the specification’s author. The price is fixed before work starts and depends on the size of the document.
Let’s discuss your project
Describe the project and the stage it is at. We reply within 24 hours and propose a way of working.