Information system acceptance testing Independent acceptance
We prepare the test programme and methodology (PMI), build a requirement–test–result matrix, run the tests or observe them, and recommend: accept, accept with conditions or do not accept. Every requirement in the specification is covered by at least one test.
- Price
- from UZS 50M
- Per release, fixed
- Timeline
- 2–6 weeks per release
- Payment
- Fixed price per stage or release.

What you get
- 01
Test programme and methodology
Our own, or the contractor’s after our review.
- 02
Traceability matrix
Every requirement in the specification linked to a test and its result.
- 03
Test reports
With a defect register and defect classification.
- 04
Recommendation
“Accept”, “accept with conditions” — with a list of conditions and deadlines — or “do not accept”.
When you need it
- The contractor is handing over the system and there is no one to check it.
- The contractor’s test programme tests what suits the contractor.
- The acceptance certificate must be signed on verifiable facts.
- The system is going into pilot or production operation.
What we need from you
- Specification and design documentation
- The contractor’s test programme, if there is one
- Test environment with data
- List of known defects
How we work
- 01
Test programme
We write our own or review the contractor’s.
ResultApproved test programme
- 02
Matrix
We link every specification requirement to a test.
ResultRequirement–test matrix
- 03
Readiness
We check the environment, data, versions and test entry criteria.
ResultDecision to start testing
- 04
Testing
We run the tests ourselves, or observe the contractor and repeat a sample of tests.
ResultTest reports and defect register
- 05
Recommendation
A conclusion based on the test results.
Result“Accept”, “with conditions” or “do not accept”
Prices in Uzbek sum (UZS), VAT included. The exact price and scope of work are fixed in the contract once we have reviewed the project.
Frequently asked questions
Who runs the tests — you or the contractor?
Either. We run the tests ourselves, or observe the contractor’s testing and repeat a sample of tests. The format is set in the test programme.
What does “accept with conditions” mean?
The system works, but there are non-critical defects. We record a list of conditions and deadlines for fixes, and the customer signs the acceptance certificate with that list.
Can we order acceptance without supervision?
Yes. Acceptance is a standalone service with a fixed price per release.