IT Project Assurance

Information system acceptance testing Independent acceptance

We prepare the test programme and methodology (PMI), build a requirement–test–result matrix, run the tests or observe them, and recommend: accept, accept with conditions or do not accept. Every requirement in the specification is covered by at least one test.

Price
from UZS 50M
Per release, fixed
Timeline
2–6 weeks per release
Payment
Fixed price per stage or release.
Plumb bobs. Brass

What you get

  • 01

    Test programme and methodology

    Our own, or the contractor’s after our review.

  • 02

    Traceability matrix

    Every requirement in the specification linked to a test and its result.

  • 03

    Test reports

    With a defect register and defect classification.

  • 04

    Recommendation

    “Accept”, “accept with conditions” — with a list of conditions and deadlines — or “do not accept”.

When you need it

  • The contractor is handing over the system and there is no one to check it.
  • The contractor’s test programme tests what suits the contractor.
  • The acceptance certificate must be signed on verifiable facts.
  • The system is going into pilot or production operation.

What we need from you

  • Specification and design documentation
  • The contractor’s test programme, if there is one
  • Test environment with data
  • List of known defects

How we work

  1. 01

    Test programme

    We write our own or review the contractor’s.

    Result

    Approved test programme

  2. 02

    Matrix

    We link every specification requirement to a test.

    Result

    Requirement–test matrix

  3. 03

    Readiness

    We check the environment, data, versions and test entry criteria.

    Result

    Decision to start testing

  4. 04

    Testing

    We run the tests ourselves, or observe the contractor and repeat a sample of tests.

    Result

    Test reports and defect register

  5. 05

    Recommendation

    A conclusion based on the test results.

    Result

    “Accept”, “with conditions” or “do not accept”

Prices in Uzbek sum (UZS), VAT included. The exact price and scope of work are fixed in the contract once we have reviewed the project.

Frequently asked questions

Who runs the tests — you or the contractor?

Either. We run the tests ourselves, or observe the contractor’s testing and repeat a sample of tests. The format is set in the test programme.

What does “accept with conditions” mean?

The system works, but there are non-critical defects. We record a list of conditions and deadlines for fixes, and the customer signs the acceptance certificate with that list.

Can we order acceptance without supervision?

Yes. Acceptance is a standalone service with a fixed price per release.

Let’s discuss your project

Describe the project and the stage it is at. We reply within 24 hours and propose a way of working.

Discuss your project

Other assurance services