IT Project Assurance

IT project technical supervision Whole-project supervision (IV&V)

We provide independent verification and validation (IV&V) for the full duration of the project. Every month the customer knows the real state of work and pays the contractor for confirmed results. Payment works as in construction supervision: monthly, with 5% retained until final acceptance.

Price
3–5% of budget
from UZS 25M a month
Timeline
Full project duration
Payment
Monthly. 5% of each payment is retained until final acceptance of the system. If the project is stopped through no fault of ours, the retention is paid with the last payment.
Plumb bobs. Brass

What you get

  • 01

    Supervision plan

    What we check, how, when and whom we report to. Agreed within the first two weeks.

  • 02

    Status updates and monthly reports

    A short status every two weeks. A monthly report with a traffic light and risks, reviewed with the project manager.

  • 03

    Review of contractor documents

    Every document within 7 business days of receipt.

  • 04

    Testing oversight

    Traceability of tests to requirements, defect resolution, spot checks of results.

  • 05

    Go-live readiness report

    Before production launch; the date is set in the supervision plan.

  • 06

    Participation in acceptance

    A recommendation to “accept”, “accept with conditions” or “do not accept”, and a final report.

When you need it

  • The project is large, runs longer than six months and has a single contractor.
  • The customer has no team of its own to review every contractor document.
  • Management needs an independent report, not the contractor’s.
  • The system will have to obtain opinions from the Ministry of Digital Technologies and the Cybersecurity Center.

What we need from you

  • Contractor agreement, specification, plan and schedule
  • The right to attend meetings and demos
  • Access to documents, test environments and the defect tracker
  • If possible, access to the repository

How we work

  1. 01

    Start

    Supervision plan and rules for the contractor: response times, channels, access.

    Result

    Agreed plan

  2. 02

    Ongoing work

    Meetings, demos, document reviews, testing checks.

    Result

    Status updates and monthly reports

  3. 03

    Checkpoints

    Design decisions, test readiness, pilot operation.

    Result

    A decision at each checkpoint

  4. 04

    Readiness assessment

    An expert panel: demo and questions. Outcome: green, amber or red.

    Result

    Go-live readiness report

  5. 05

    Acceptance and close-out

    We take part in acceptance and hand the materials over to the customer.

    Result

    Final report

Prices in Uzbek sum (UZS), VAT included. The exact price and scope of work are fixed in the contract once we have reviewed the project.

Frequently asked questions

Why 3–5% of the budget?

The international benchmark for independent verification is 3–10% of the project budget. Large IT projects run on average 45% over budget (McKinsey and the University of Oxford). Supervision pays for itself if it prevents a tenth of a typical overrun.

Why retain 5%?

So that the customer pays us, as it pays the contractor, for results. The retention is paid once the final system acceptance certificate is signed.

What if you find a critical problem?

The project manager and the customer’s sponsor are informed in writing within one business day, without waiting for the monthly report.

Does supervision get in the contractor’s way?

Not if the rules are clear from day one. The contractor knows which documents are reviewed and on what timelines, and receives findings backed by evidence, not opinions.