IT Project Assurance

Technical specification development Turnkey technical specification

We write specifications that contractors understand and that pass expertise. We survey processes, gather requirements with a source for each, calculate the cost ceiling and support the specification through to a positive opinion. Internal review is done by another expert on the team, not the author.

Price
from UZS 150M
Fixed by scope
Timeline
6–12 weeks to submission
Payment
In stages: survey, draft specification, positive expertise opinion.
Plumb bobs. Brass

What you get

  • 01

    Survey report

    As-is and to-be processes, stakeholders, integrations.

  • 02

    Requirements register

    A source for every requirement. Non-functional requirements with measurable criteria under ISO/IEC 25010.

  • 03

    Technical specification

    To GOST 34.602-2020 or the Ministry of Digital Technologies template: with information-security requirements, control and acceptance procedures, documentation and training.

  • 04

    Cost ceiling calculation

    With a justification that stands up to the expert body’s questions.

  • 05

    Expertise support

    Responses to the state expert body’s comments through to a positive opinion.

When you need it

  • The project is at the passport or concept stage and there is no specification yet.
  • You have no analysts of your own, or they are busy with day-to-day work.
  • You need a specification on which contractors will quote comparable prices.
  • You need a procurement with a functional description, not tied to a vendor.

What we need from you

  • Project goals and passport
  • Access to process owners, IT, information security and legal
  • Description of current systems
  • Project budget

How we work

  1. 01

    Survey

    Interviews, as-is and to-be processes, list of integrations.

    Result

    Survey report

  2. 02

    Requirements

    A requirements register with a source for each, and measurable non-functional requirements.

    Result

    Requirements register

  3. 03

    Draft specification

    Specification to GOST 34.602-2020 or the Ministry of Digital Technologies template, cost ceiling calculation.

    Result

    Draft specification and calculation

  4. 04

    Internal pre-review

    Another expert on the team checks the specification against the same criteria as a pre-review.

    Result

    Corrected draft

  5. 05

    Sign-off

    We go through the specification with the customer and record disagreements in minutes.

    Result

    Agreed specification

  6. 06

    Expertise

    We respond to the state expert body’s comments until a positive opinion is issued.

    Result

    Positive opinion

Prices in Uzbek sum (UZS), VAT included. The exact price and scope of work are fixed in the contract once we have reviewed the project.

Frequently asked questions

Why shouldn’t the contractor write the specification?

The specification defines what the customer will pay for and what it can accept. A specification written on the customer’s side brings comparable bids and fair acceptance.

Will you bid on your own specification?

No. If we wrote the specification, we do not take part as contractor, subcontractor or consortium member in that lot or in any lots that follow from it.

How long does it take?

6–12 weeks to submission for expertise, depending on scale. Specification expertise itself takes 30 calendar days.

Which standard do you write to?

GOST 34.602-2020 or the template the expertise operator requires. For commercial projects, a structure agreed with the customer.

Let’s discuss your project

Describe the project and the stage it is at. We reply within 24 hours and propose a way of working.

Discuss your project

Other assurance services